HERITAGE

Project: Betley Court Mansion House, Crewe – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • AP – review Lift Plans
  • TWC

 

 

Scope of Work

  • Fire damage emergency works to Grade II* Listed Building
  • Enabling Works
  • Strip-Out
  • Partial Demolition
  • Lifting Operations
  • Temporary Works
  • Reinstatement

Significant Hazards

  • Work at Height
  • Loose masonry
  • Lifting Operations
  • Unstable elements
  • Traffic Management
  • Local occupied properties
  • Construction and fire debris dust/soot

Project: Bellman Park Lime Kilns Clitheroe – 2020

Appointment

  • Principal Designer
  • CDM Advisor

 

 

Scope of Work

  • Stabilisation and repair work to 19th Century Scheduled Monument – lime kilns built in 1877

Significant Hazards

  • Work at Height
  • Protected Species
  • Working near a live railway line
  • Site access
  • Falling masonry

Project: Church of Ascension, Manchester – 2017 – 2020

Appointment

  • Principal Designer
  • CDM Advisor
  • Site Safety Inspections

 

 

Scope of Work

  • Strip out & partial demolition of fire damaged church
  • Structural stabilisation of sandstone columns
  • Column replacement and fabric repair
  • Re-roofing
  • Reinstatement
  • Installation of 19th Century Ecclesiastical Chapel Organ and Furniture

Significant Hazards

  • Complex Temporary Works
  • Work at Height
  • Partial Demolition

Project: Wythenshawe Hall, Manchester – 2016 – 2019

Appointment

  • Principal Designer
  • CDM Advisor
  • AP to check Lift Plans
  • Site Safety Inspections

 

Scope of Work

  • Arson damage – sympathetic reinstatement and restoration to 16th Century Grade II* Listed Building

Significant Hazards

  • Lifting Operations re: Bell Tower removal and replacement
  • Temporary Works
  • Exposed timber frame & high fire load
  • Secondary damage from water ingress
  • Public Events in the park