TOWERS

Project: Multiple UK tower blocks/high-rise buildings – 2017 – present

Appointment

  • Principal Designer duty holder role
  • Health & Safety Consultant
  • CDM Advisor
  • Review Construction Phase Plans
  • Review Project Fire Risk Assessments
  • Review Temporary Works Designs & Register
  • Review of Existing Fire Risk Assessments

 

Scope of Work

  • Cladding and Insulation Inspection, Surveying, Removal, and Replacement with Non- Combustible Materials
  • Passive Fire Protection Solutions
  • Balconies & Glazing
  • Spandrel Panels
  • Render
  • ACM / HPL

Significant Hazards

  • Work at Height
  • Lifting Operations
  • Working above water
  • Temporary Works
  • Rooftop Work
  • Rope Access
  • MEWPs
  • MCWPs
  • Scaffolding
  • Occupied buildings
  • Fire Precautions
  • Access/Egress
  • Swept Path for Fire & Rescue Service Aerial Platforms
  • Fall Prevention v Fall Arrest
  • Inclement and Extreme Weather Events
  • Rooftop Safety Systems and BMUs
  • Working alongside Network Rail Assets